top of page

DEHYDRATION UNITS

At Bilton our team has experience with designing and manufacturing large dehy systems in gas storage plants with combined flows up to 200 mmscfd.

We have standard dehy system designs ranging in size from 12” to 60” contactor diameter using both hot oil and firetube heat sources for regeneration.

At Bilton we have incorporated design innovations that increase the efficiency of dehy heat recovery systems and with building high purity TEG regeneration systems in order to ensure low water content gas which exceeds standard pipeline spec for water content.

By using our process simulation software, we simulate each process for dehy applications to ensure accurate design and to identify any
system capacity limitations to ensure a standard design fully meets the process requirements of each application. This simulation can
also be used to assist operational fine tuning.